(1)紅塔集團玉溪復烤及倉儲項目-場地平整排水系統二期工程地基強夯處理面積約400000㎡。
The Foundation treated by heavy tamping with area of 400000㎡, Site Leveling and Water Drainage System Phase Two Works, The Threshing, Redrying and Storage Works of Hongta Tobacco Group
(2)云南德勝鋼鐵集團有限公司地基強夯處理工程
The Foundation treated by heavy tamping for Yunnan Desheng Steel Group Co., Ltd.
(3)原料場地基強夯處理面積48000㎡
The Foundation of Raw Material Store Yard treated by heavy tamping with area of 48000㎡
(4)焦化廠地基強夯處理面積36000㎡
The foundation of Coking Plant treated by heavy tamping with area of 36000㎡
(5)機修廠地基強夯處理面積60000㎡
The foundation of Workshop treated by heavy tamping with area of 60000㎡
(6)煉鋼廠地基強夯處理面積4800㎡
The foundation of Steel Making Mill treated by heavy tamping with area of 4800㎡
(7)煤氣柜地基強夯處理面積15000㎡
The foundation of Coal Gas Container treated by heavy tamping with area of 15000㎡
(8)楚雄州祿豐縣官洼小區地基強夯處理面積80000㎡
The foundation of Guanwa Residential Quarter, Lufeng County, Chuxiong Prefecture ?treated by heavy tamping with area of 80000㎡
(9)楚雄州祿豐縣公務員小區地基強夯處理面積40000㎡
The foundation of Public Servant Residential Quarter, Lufeng County, Chuxiong Prefecture? treated by heavy tamping with area of 40000㎡
(10)楚雄州清山嘴水庫工程地基強夯處理面積60000㎡
The foundation of Qing Shan Zui Reservoir Chuxiong Prefecture? treated by heavy tamping with area of 60000㎡
(11)玉蒙鐵路工程地基強夯處理面積23000㎡
The foundation of Yuxi to Mengzi Railway treated by heavy tamping with area of 23000㎡
(12)曲靖市經濟技術開發區標準廠房地基強夯處理面積40000㎡
The foundation of Standard Factory Buildings for Qujing City Economic and Technical Development Zone treated by heavy tamping with area of 40000㎡
(13)昆明市宜良縣華僑城人工湖壩體強夯工程強夯處理面積5100㎡
The dam body of artificial lake for Overseas Chinese Town, Yiliang County, Kunming City treated by heavy tamping with area of 5100㎡
(14)昆明通威有限公司廠房及道路強夯工程強夯處理面積15000㎡
The factory buildings and roads of Kunming Tongwei Co., Ltd. treated by heavy tamping with area of 15000㎡
(15)云南省昆明市大板橋昆明新飛機場
Kunming New Airport, Dabanqiao, Kunming City, Yunnan Province
(16)機庫區地基強夯工程強夯處理面積45000㎡
The foundation of Airplane Garage treated by heavy tamping with area of 45000㎡
(17)1號、2號、3號及機場地平地基強夯工程強夯處理面積360000㎡
The foundation of No.1,No.2, No.3 and airport apron treated by heavy tamping with area of 360000㎡
(18)貨運區地基強夯工程強夯處理面積50000㎡
The foundation of freight zone treated by heavy tamping with area of 50000㎡
(19)航食區及機供品區地基強夯工程強夯處理面積60000㎡
The foundation of onboard food zone and airplane supply zone treated by heavy tamping with area of 60000㎡
(20)彌勒西三鎮地基強夯工程強夯處理面積62000㎡
The foundation of Xi’san Township, Mile County treated by heavy tamping with area of 62000㎡
(21)雅居樂騰沖項目B區2號地基處理強夯面積120000㎡
The No.2 foundation of B zone, Yaleiju (Tengchong) Project treated by heavy tamping with area of 120000㎡